|
|
|
News: Sludge dehydration in Morocco The third installation delivered to the Ménara Group (Marrakech - Morocco) has been lately commissionned on the Bourrous site.
Made of one sand unit fitted with 2 cyclones, one thickener 14 m in diameter and one filter press (capacity : 2500 litres), this installation is fully galvanised and is able to wash 200 t/h of sand, recycle 500 m3/h of water and press 12 t/h of dry solids.
The company MS thanks, once again, the Ménara Group for its confidence.
|
|
|
|
|
|
|
|